How to Use It
Check the quantity of lights and accessories. Assemble the lights on the floor, connect to power supply to test function properly, then install it on the ceiling.
1 Step 1
Entire lighting structure should be assembled on the floor before mounting. Connect the longer lighting tubes with straight and 90-degree connectors to make the border. Make sure tubes are carefully inserted all the way into the connectors.
2 Step 2
Place T connector at the corner of the border where a power cable will connect to power supply. Must connect power cables at ALL circled locations on diagram to power lighting grid evenly.
3 Step 3
Next, construct each hexagon shape into columns by connecting lighting tubes with the elbow and Y connectors to make your desired pattern.
4 Step 4
Place Y connectors outside of hexagons where power cables will plug into and connect to power supply. Number of power cables required is dependent on the size and amount of lighting tubes in your kit. Must connect power cables at ALL circled locations on diagram to power lighting grid evenly.
5 Step 5
Test before final ceiling installation. It is recommended to consult with a licensed electrician to ensure that your electrical setup is sufficient and to perform final connection to power supply.
6 Step 6
Raise and install to the ceiling as whole or in sections. Hang with screws through connector holes (preferred method), suspend with wire, or fasten with zip ties. Connect to power supply once installed to ceiling.
Frequently Asked Questions
Q1: Can I have samples to test?
Yes, we are pleased to supply samples to test and check our quality.
Q2: Do you have any MOQ limit for orders?
Our MOQ for order is 100 meters.
Q3: What is the delivery time?
Samples: 3-5 days; Mass production: 7-10 days.
Q4: What payment methods do you accept?
We accept T/T (bank transfer), PayPal, Western Union, and L/C (for amounts >100,000 USD).
Q5: Do you offer a guarantee for your products?
Yes, we offer a 3-year guarantee. During this period, we can replace any products with quality problems.
Q6: How do you ship the goods and how long does it take?
DHL/UPS/FEDEX/TNT (3-5 days), by air (5-7 days), or by sea (15-30 days).